Docsroom

Solutions / Construction

No certificate, no gate pass.

Every subcontractor owes you the same pile before they set foot on site, and half of it expires. One list per firm, one board across the job, and the dates chase themselves.

Before you start on site · Redhill Groundworks4 of 7 back5 of 7 back
  • UploadPublic liabilitypublic-liability.pdfComplete
  • UploadCSCS cardssite teamReminder sent
  • ApprovalSigned orderand ratesReady to check
The list

What a subcontractor owes you

One template per trade. A groundworks firm and an electrical contractor need different tickets, and neither needs the other’s.

Tanner Groundworksbefore you start on site8 of 10 back
  • The firm
  • UploadLiability insurancewith the scheduleMTMarie TunnicliffeHannahin 3 daysComplete
  • FormUTR and CIS details4 questionsMTMarie TunnicliffeHannahin 5 daysComplete
  • QuestionVAT numberor noneMTMarie TunnicliffeHannahin 7 daysReady to check
  • UploadWaste carrier licenceif it appliesMTMarie TunnicliffeHannahin 9 daysComplete
  • ApprovalSubcontractand payment termsMTMarie TunnicliffeHannahin 11 daysAwaiting reply
  • The works and the team
  • UploadRAMSmethod and riskWNWesley NolanHannahtomorrow2 files sent
  • FormWho is attendingrepeats per personWNWesley NolanHannahin 3 daysComplete
  • UploadCSCS cardsboth sidesWNWesley NolanHannahin 5 days6 files sent
  • UploadTrade ticketscompetence cardsWNWesley NolanHannahin 7 daysReady to check
  • UploadPlant certificatesWNWesley NolanHannahin 9 daysAwaiting reply

An illustration. The names are made up.

How it works

Before anyone gets on site

Expiry is the point

Insurance runs out. Cards run out. Put the renewal date on the request and the chasing runs off it: a reminder three days out, one on the day, and overdue on the board until the new certificate lands.

A room per firm, one board

Fourteen subcontractors on one job, each with their own list and their own link, and one board showing who is not cleared to start on Monday.

CIS without the shoebox

Verification details, the UTR and the deduction status sit with the firm they belong to, and export as CSV when your accountant asks for them.

The pictures are illustrations. The names are made up.

The board says who cannot start

Rather than opening fourteen folders, you look at one screen: who is complete, who is waiting on one thing, and what is overdue. That is the conversation you need before a Monday start.

  • Filter by site, by firm or by overdue
  • Due dates moved in bulk with the start
  • Everything exports as CSV for the file
Fenwick Street · before they start
  • RGRedhill Groundworksstarts Monday2 overdue
  • VEVale Electricalstarts the 22nd1 awaiting
  • HRHollis Roofingnothing outstandingCleared

Photographs of cards, from site

A foreman photographs a competence card at the gate and it lands on that operative’s request, dated. No email, no app, no getting it back to the office.

Upload

CSCS cards

Redhill Groundworks

cscs-card.jpg

Take a photo

1 file sent

Where the checking stops

Docsroom records what a subcontractor sent, when it arrived and every download since. It does not verify a subcontractor with HMRC, does not check a card against the scheme that issued it, and does not decide whether a method statement is adequate for the works. Those stay with you, and they are easier when the paperwork is in one place with dates on it.

Clear the next site before it starts.

Free for 14 days, no card.